MCS-044 ASSIGNMENT SOLUTION (2020-21)

 

A book store proposes to develop a "Book Sales Information System". The information system provides secure login to book store employees. The services offered by this system should include - finding the availability of a book in the book store; taking orders from the customers for the books, which are not available; making an invoice for sale for customers; ordering of the books, which are high in demand and stock of those books have reached a low level.

You may study the requirements for such a system in more details. Perform the following tasks for the system given above :

Q1. a) Which Systems Development Life Cycle (SDLC) will you propose for the specification given above?

Answer : - The systems development life cycle (SDLC) is a conceptual model used in project management that describes the stages involved in an information system development project, from an initial feasibility study through maintenance of the completed application.

There are various SDLC models defined and designed which are followed during the software development process. Some important and popular SDLC models are given below −

  • Waterfall Model
  • Q1. b) Justify you selection by evaluating suitability of at least two SDLCs.

Answer : -

Waterfall Model - The Waterfall Model was first Process Model to be introduced. It is also referred to as a linear-sequential life cycle model. It is very simple to understand and use. In a waterfall model, each phase must be completed fully before the next phase can begin. This type of software development model is basically used for the project which is small and there are no uncertain requirements.

At the end of each phase, a review takes place to determine if the project is on the right path and whether or not to continue or discard the project.

Q2. a) What would be major costs of the system?

Answer : - 

 

Q2. b) What may be the financial benefits of installing such a system?

Answer : - 

Q2. c) Perform a cost-benefit analysis for the proposed software and report its findings.

Answer : - 

 

Q2. d) List the major tasks and milestones of the Project and make a project schedule. The schedule must include both GANTT and PERT charts. Explain the two charts drawn by you.

Answer : - 

 

Q3. a) Study the system and create a software requirement specification. You must identify either the processes or objects while analyzing. During the analysis give consideration to possible input and output of the processes.

Answer : - 

Q3. b) After identifying the requirements, create Analysis Models. You may either use the classical approach and draw Entity relationship diagram and data flow diagrams (DFD’s) up to level 2-3; or you may take object oriented analysis approach and create class diagram, use case diagram, use cases etc.

Answer : -



Q4. a) Design the system architecture and the database as per the needs of the system. You must perform normalization on tables up to 3rd normal form. The table design must include Primary and Foreign keys and constraints.

Answer : -

Table Name : admin_login

Field Name

Data Type

Constraint

Description

username

varchar(20)

Primary Key

Username for administrator login

password

varchar(32)

Password for administrator login



Table Name : books




Q4. b) Create the system flow chart or detailed process design and state transition diagrams. Also design the user input screens and output report formats.

Answer : - 





Q5. Design various unit test cases for different testing techniques/strategies.

Answer : - 

Dear students, get fully  solved assignments by professionals

Do send your query at :

help.mbaassignments@gmail.com

 

or call us at :08263069601

 

 

No comments:

Post a Comment

Note: only a member of this blog may post a comment.