BC0054 – SOFTWARE PROJECT MANAGEMENT & QUALITY ASSURANCE

Dear students get fully solved assignments
Send your semester & Specialization name to our mail id :

“ help.mbaassignments@gmail.com ”
or
Call us at : 08263069601
(Prefer mailing. Call in emergency )


WINTER 2013, ASSIGNMENT

DRIVE
SUMMER 2014
PROGRAM
BACHELOR OF COMPUTER APPLICATION
SUBJECT CODE & NAME
BC0054 – SOFTWARE PROJECT MANAGEMENT & QUALITY ASSURANCE
SEMESTER
5TH SEM
CREDITS
4
MAX. MARKS
60
BK ID

B0958


Answer all questions



Q.1. Explain Centralized-Control and Decentralized-Control Team Organization. [5+5] =10
ANS:

Centralized-Control Team Organization: Centralized-control team organization is a standard management technique in well understood disciplines. In this mode of organization, several workersreport to a supervisor who directly controls their tasks and is responsible for their

Q.2. What is Software Configuration Management? Explain its Goals. [4+6] =10
ANS:

Software Configuration Management: Software configuration management (SCM) is a set of activities to control change by identifying the products that are likely to change, establish relationships among them, defining mechanisms for managing different versions of these work products, controlling the changes imposed and auditing and reporting on the changes made. In short

Q.3. Explain Waterfall life cycle model. [10] =10
ANS:

Waterfall life cycle model:  The "waterfall model", documented in 1970 by Royce was the first publicly documented life cycle model. The model was developed to help cope with the increasing complexity of aerospace products. The waterfall model followed a documentation driven paradigm.

Q.4. What is Gantt Chart? What are its advantages? [5+5] =10
ANS:

Gantt Chart: Henry Laurence Gantt, A.B., M.E. (1861-23 November 1919) was a mechanical engineer and management consultant who is most famous for developing the Gantt chart in the 1910s. These Gantt charts were employed on major infrastructure projects including the Hoover Dam and

Q.5. List the various activities under the risk management. [10] =10
ANS:

Risk Management: There are two stages in the process of Project Risk Management, Risk Assessment and Risk Control. Risk Assessment can take place at any time during the project, though the sooner the better. However, Risk Control cannot be effective without a previous Risk Assessment. Similarly, mostpeople tend to think that having performed a Risk Assessment; they have done all that is needed. Far too many projects spend a great deal of effort on Risk Assessment and then ignore Risk

Q.6. Define (a)Software assurance, (b) Software Engineering, (c) Software Management, (d) Software reviews, (e) Code Reviews [5x2] =10
ANS:

Software Assurance: Software development, like any complex development activity, is a process full of risks. The risks are both technical and programmatic. that is, risks that the s
Dear students get fully solved assignments
Send your semester & Specialization name to our mail id :

“ help.mbaassignments@gmail.com ”
or
Call us at : 08263069601
(Prefer mailing. Call in emergency )


No comments:

Post a Comment

Note: only a member of this blog may post a comment.